Noise Impact Assessments for TeesWorks 1GW/4GWh Battery Storage Project.

Noise Impact Assessments for Battery Energy Storage System (BESS)

NatPower are experts in renewable energy in the UK and manage a diverse portfolio of sites and planning matters. They were managing the development of a battery energy storage system, we were approached to carry out a noise impact assessment in accordance with BS4142:2014+2019.

We began by determining background sound levels at areas on the perimeter of the site, to act as a baseline for the assessment before undertaking a comprehensive analysis of noise emissions that would ultimately be emitted once the storage facility was operational.

This work carried out by our team of acoustic experts meant that a full report could be provided to the NatPower team, thoroughly detailing how noise emissions could be minimised in order to comply with the Local Planning Authority.

Our expert team of acoustic consultants is here to support your industrial project through planning permission or environmental permitting. We can assist with industrial noise assessments and environmental permitting noise assessment support
  
Contact our team of acoustic consultants for support with your next project.   

Recent Projects

Criterion Capital Zedwell Featured v2

Acoustic consultancy services for the conversion to form a 600+ bed hotel for Zedwell in London.

Criterion Capital Hostel Featured

Acoustic consultancy services for the conversion to form a Capsule Hotel in London.

OU featured

Acoustic design of the Open University’s Multimedia Studio and Office Refurbishment.

Who we work with