Nationwide Delivery
High Performance
Great Value
Expert Advice
NOVA LS-ST-03
92mm "I" Staggered Steel Studwork
① 2 x 15mm Soundboard min 12.6 kg/m²
② Two rows of 92mm 92 I 90 "I" Staggered Steel Studs
③ 50mm RW45 Slab Insulation min 45 kg/m³
④ 2 x 15mm Soundboard min 12.6 kg/m²
Fitting Detail
Installation Tips
1. Ensure all specified materials and dimensions are in accordance with the drawing.
2. Construct the ‘party’ wall from the true subfloor to soffit.
3. Install studwork tracking with isolation tape at the junctions with the floor and ceiling.
4. Install Insulation tightly fitted between studwork, with no gaps and ensure the air cavity is not bridged at any point.
5. The studs are then friction fitted between studwork, with no gaps and ensure the air cavity is not bridged at any point.
6. Affix acoustic plasterboard to the steel stud. Affix the second acoustic plasterboard with staggered joints. Ensure a 3mm gap is maintained around the perimeter and seal with acoustic sealant.
7. Don’t install electrical sockets on party walls.
8. Don’t route service pipes through party walls.
9. Ensure ALL flanking routes are suppressed.