NOVA TB-AC-02
Double 70mm Timber Studwork with Air Cavity
① 2 x 15mm Soundboard min 12.6 kg/m²
② 70mm Timber Studwork
③ Min. 50mm Air Cavity
④ 50mm RW45 Slab Insulation min 45 kg/m³
⑤ 70mm Timber Studwork
⑥ 2 x 15mm Soundboard min 12.6 kg/m²
Fitting Detail


Installation Tips
1. Ensure all specified materials and dimensions are in accordance with the drawing.
2. Construct the ‘party’ wall from the true subfloor to soffit.
3. Install studwork tracking with isolation tape at the junctions with the floor and ceiling.
4. Install Insulation tightly fitted between studwork, with no gaps and ensure the air cavity is not bridged at any point.
5. Make sure there is no connection between the two leaves except where ties are necessary for structural reasons. Minimum 50mm of air cavity.
6. Affix acoustic plasterboard to the steel stud. Affix the second acoustic plasterboard with staggered joints. Ensure a 3mm gap is maintained around the perimeter and seal with acoustic sealant.
7. Don’t install electrical sockets on party walls.
8. Don’t route service pipes through party walls.
9. Ensure ALL flanking routes are suppressed.